Testing

Testing was performed initially on each subsystem to ensure each part of the system was working as desired. From there, the systems were combined an tested. First the controls were integrated with the power system and tested. The flow loop was then integrated into testing, followed by the object manipulation system, and finally the navigation system. The details of the testing can be found in the subsequent pages.