Experiment Setup

The experimental setup has been designed to measure the energy input to the chamber and force output of an elastomer water jet propulsion mechanism. The energy input is measured in 3 ways. The first method is through the voltage and current input to the rover. The second is through the hydrogen gas input with volumetric flow meters. The third is gas input from the oxygen volumetric flow meters. Either volumetric flow can be used because they should be being produced in stoichiometric quantities, ensuring that each test is completely oxyhydrogen to maximize energy output.

Water Jet Propulsion Force and Mobility Test Stand
Water Jet Propulsion Force and Mobility Test Stand

Water Jet Propulsion Force and Mobility Test Stand

Fuel cells were used to generate the hydrogen and oxygen gas for these tests. The fuel cells used were Horizon Technology PEM Fuel Cells meant for educational demonstrations and cost less than $50. The electrical energy input to the fuel cells was indirectly measured through voltage and current through known loads. Additionally, two pressure based flow meters were used to measure the standard cubic centimeters of hydrogen and oxygen produced. A pressure gauge was placed in series and is used to determine when a pressure equilibrium is reached between the inside of the elastomer waterjet and the atmosphere. A load cell is used to determine the propulsive force generated by the the waterjet. Finally, a high speed camera captures the dynamics of the waterjetting process and is capable of indicating everything from the volumetric expansion rate of the gas, strain rate of the elastomer, and velocity of the combustion chamber.

The process for measuring the force output by the elastomer hydrojet and energy input is as follows:

  1. A vacuum pump is used to remove a majority of the gas from the chamber typically down to -0.7psi. This removes the gasses contained in the hoses and elastomer waterjet which contain a combination of oxygen, hydrogen, water vapor, water, nitrogen, and the other trace elements that constitute air. This is not sufficient to pull a complete vacuum, but removes some of the remnant gasses.
  2. The fuel cells are powered until they have produced the desired volume of gas
  3. The voltage applied to the fuel cells is measured
  4. The voltage drop across a known resistance in series with the fuel cells is measured
  5. The power to the fuel cells are turned off
  6. The Hydrogen gas and Oxygen gas supply valves are closed
  7. The gas supply data is saved
  8. The load cell data collection is turned on
  9. The Glow Plug ignition switch current limiter is removed
  10. The high speed camera begins recording
  11. The gas is ignited
  12. The high speed camera recording is saved
  13. The load cell data is saved

Test setup
Test setup

Occasionally, the gas does not initially ignite and a second recording must occur.

After the first combustion of the day, the following anomalies tend to occur that change the dynamics of the test. The gas in the chamber has lots of condensation and water vapor from the previous combustion that adds to the residual gasses in the test. This may contribute to subsequent tests occurring at lower expansion times than the first test. The glow plug is also often coated in water. In order for the H2 and O2 gas to combust, the glow plug must run long enough for the water droplets condensed on the surface of the glowplug to evaporate and the local concentration of H2 and O2 to reach the minimum ignition concentration.

The load cell data is limited in rise time and peak time by the amplifier used.